Hi, I'm going to need to move our installation of MAS 90 to a new server. I've been trying to get our MAS consultant to address this, but he's MIA. We're currently on version 4.40. The application is running on a Windows 2008 R2 server. I'll be moving it to a VM running Windows 2012 R2. In terms of processors and RAM, the VM is pretty much equivalent to the current environment. The total footprint of the current install is about 10GB. Based on other posts in this community, the migration is relatively basic on this version. Namely: 1. Install MAS on new server 2. Use the parallel migration utility to move the data over. 3. Configure clients to point to new server Are there any additional steps or requirements that I need to consider? The current installation includes the Visual Integrator component. We haven't used it yet, so there's really no configuration or data associated with it. But I need to move it to the new environment as well. Where can I find detailed information to move or re-install this component? I'm open to any recommendations regarding this move.
↧