Quantcast
Channel: Sage 100
Viewing all articles
Browse latest Browse all 37127

Forum Post: Changing Multiple Bill of Materials items at once / Sage100 ERP

$
0
0
I have about 200 items from which I need to remove one component item and replace it with another. Is there a way in which I can do this without having to go into BOM Maintenance for each of the 200 items and doing it manually? I know I can add the additional material via Visual Integrator, but how can I remove the existing one? Or, is there an easier way? I am on Sage100 ERP 2014 Advanced (V. 5.10.3.0) Thank you in advance.

Viewing all articles
Browse latest Browse all 37127

Trending Articles