Quantcast
Channel: Sage 100
Viewing all articles
Browse latest Browse all 36990

Forum Post: Work tickets

$
0
0
What would cause a work ticket to calculate the parts needed wrong?  We created a work ticket for (1) parent item with a qty of (3).  If it takes (1) bolt to build one assembly then the w/t should have a qty of (3).  I did do another w/t for the same item qty (3) and it came out correctly.  Could it have been something that was done differently when the qty was multiplied wrong?

Viewing all articles
Browse latest Browse all 36990

Trending Articles