What would cause a work ticket to calculate the parts needed wrong? We created a work ticket for (1) parent item with a qty of (3). If it takes (1) bolt to build one assembly then the w/t should have a qty of (3). I did do another w/t for the same item qty (3) and it came out correctly. Could it have been something that was done differently when the qty was multiplied wrong?
↧